< Back to Portfolio

Cleveland Clinic - Cleveland Innovation District - Modular Labs

Project Type: 
Lab + Research
Address:  East 100th StreetClevelandOH
Contractor: Gilbane Building Company
Contract Value: $2,400,000.00
Owner: Cleveland Clinic
Architect: HOK
Year: 2024

Scope of Work

  • BIM Coordination LOD400
  • Prefab warehouse setup, QA/QC process and tracking via Autodesk Construction Cloud
  • Framing
  • Insulation
  • Backing
  • Drywall
  • Taping
  • Painting
  • ACT Grid + Tile for Devices
  • Shrink Wrapping, Transportation to Site, Loading and Setting.
RG Construction was selected as the framing and drywall risk reward major trade partner for this IPD project with the Cleveland Clinic. During Schematic Design, RG identified an opportunity to provide a volumetric modular alternative to stick building 44 PI and Tissue Culture labs, which represented approximately 16% of the total interior partitions within the CBB Building of the Cleveland Clinic Innovation District. This opportunity also transferred 18,000 trade labor hours from the jobsite and fully incorporated all of the electrical and mechanical systems within the room. Simply put these 44 rooms were built and set with a total of 9 tradesmen vs. a stick-built option would of required over 30 tradesman to execute the work. Likewise, by executing this volumetric opportunity the team picked up 48 crew days in the construction schedule related to the completion of CBB.
Chicago Area

936 North Larch Ave
Elmhurst, IL 60126
(630) 782-0180

Central Illinois

148 Thunderbird Lane
East Peoria, IL 61611
(309) 282-8500

RG Specialties (”RGCS”) is our one-stop shop for all of your specialty architectural finishes

@RG Construction Services, Inc. All Rights Reserved
Menu