Prefabricated Exterior Cold Form Framed Panels with Sheathing and AVB (89,000 SF)
Cold Formed Metal Framing
Consolidated Robotic Layout (All Trades)
Interior Drywall Framing
Insulation
Drywall
Shaftwall Assemblies
Acoustical + Specialty Ceiling Systems
Direct Applied Plaster System
GFRG Columns
Make Ready + Temporary Construction Partitions
RG Construction was chosen as a Major Trade Partner on Advocate Aurora Health’s IPD project due to our preconstruction capabilities and operations excellence. The CAC West Expansion and Vertical Bed Tower overbuild is the 3rd project on this complete campus transformation. Given the adjacency to the existing hospital and overbuild of the existing CAC, this project was broken into to phases with 70% of the overall construction happening in phase 1. RG participated in all aspects of the design process providing continuous budgeting and cost information to establish the Target Cost for our scope of work. One major opportunity brought forward by RG to save on schedule was prefabricating 89,000 SF of back wall enclosure complete with framing, sheathing, AVB and brick ledgers. RG used our BIM capabilities to fully model and coordinate our assemblies with our other trade partners to LOD 400 and used Dusty Robotics and a Consolidated Layout approach to print all trades layout on the floor in one pass.
Chicago Area
936 North Larch Ave Elmhurst, IL 60126 (630) 782-0180
Central Illinois
148 Thunderbird Lane East Peoria, IL 61611 (309) 282-8500